Skip to main content

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: Completed
(22 results)



Display: 20



    •  
    • CAA War Training Service
    • Page 5: This is an aerial close-up of the Airport and buildings. Between the main building and the large hangar may be seen 20 Cubs used for Elementary training. The left of the main building is the line of Fairchild trainers used for Intermediate...
    • 2008-8-005


    •  
    • CAA War Training Service
    • Page 8: Mr. Nelson, Company Auditor, checking completed stage forms.
    • 2008-8-011
    • ITD_01145

    •  
    • Dedication of the Blackfoot - Idaho Falls - Bassett section of I-15, 38.6 miles completed October, 1962. cost $13.790.000. (Governor Smylie, right)
    • 10/31/1962
    • Company 2527, Camp DG-3 - W.P.A. Project 728  Cricket Control

    • Camps; Pest control; Conservation and restoration; Agriculture; Insects
    • Work Project 728 showing dead and alive crickets. Workers from Camp DG-3 completed this pest control project. One rancher doubled his crops in 1936 over 1935 because of the cricket control program.
    •  
    • Sawmills

    • Sawmills; Lumber industry; Lumber; Lumberyards; Construction; Construction equipment; Pickup trucks; Construction workers;
    • Construction of the Harris Brothers sawmill. The tipi burner for waste sawdust is already completed.
    •  
    • North Idaho2

    • Road Construction;
    • Rock river fill before being completed
    • P1992-44-149


    •  
    • CAA War Training Service; navy; Lewiston Normal School
    • Page 44: SPALDING HALL, the dormitory completed in 1924 and converted into a men's hall two years ago, furnishes accommodations for a maximum of sixty-eight men. The rooms are arranged in suites, with two study rooms, a dressing room, and a...
    • 2008-8-077
    • Camp F-132 - Bridge Construction

    • Bridges; Bridge construction; Forests; Rivers; Men; Suspension bridges;
    • Bridge built by Company 531 - Camp Big Creek #2, F-182. Bridge not yet completed in this photo. Project worked between January and June 1939.
    •  
    • Beth Israel Synagogue

    • synagogues; Judaism
    • Beth Israel Synagogue, Boise. 1102 State Street. Completed in 1895.
    •  
    • ITD_07427

    •  
    • Excavation work underway for new American Falls Dam & roadway. (Project to be completed by June 1, 1978.)
    •  
    • Boise Basin Quilters' Quilt Inventory

    • quilts
    • The Collection includes a history sheet (or sheets) for each quilt along with an image of the quilt. There are also three boxes of slides that feature several photographs of each quilt.
    • MS833
    • 
Heyburn State Park - Cooking Shelter

    • Conservation and restoration; Camps; Recreation; Picnic grounds; Fireplaces; Masonry; State parks
    • This enclosed cooking area is one of the Civilian Conservation Corps projects completed by the enrollees during construction of the park in the 1930's
    •  
    • Completed pavement

    • Road Construction; Construction Equipment;
    • 14 days curing period, ponds and dykes
    • P1992-44-258
    • Morning Club 2

    • Clubhouses; Brickwork; Utility poles; Streets; Sidewalks; mining
    • Morning Clubhouse completed
    •  
    • Boise Junior College (B)

    • ; Universities & colleges; Buildings;
    • A full view of the newly completed campus building at Boise Junior College on the site of the old airport.
    •  

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK